Sector of activity
ERP classification
Location
Project Owner
Architect
Built area /
Land area
Reference
Sports Infrastructure
Third category
Yaoundé, centre Cameroun
ENA Football Club
Menla’ BET
m2 /
m2
——-
The ENA Sports Complex is a sports facility equipped with several services, including…
All these components comply with the current standards related to their activities for local competitions.
Menla’ BET conducted the complete studies and project management for the project.
Technical studies
Architecture :
3D sketch, Site layout plan, and 2D distribution plans.
Civil engineering
Reinforced concrete structure: foundation plans, reinforcement plans, and formwork plans.
Metal structure: metal framework for the stands and gymnasium (bolting and assembly details).
Sizing of the electrical installation of the building.
A specifications document based on the requirements of each piece of equipment in the care chain (water treatment unit, dialyzers, air conditioning) helped define an electrical architecture that complies with standards and is consistent with the functionality of the building.
Low current electrical systems.
The safety of people and property is crucial and must therefore be controlled during the design phase of the project. The structure
will therefore be equipped with a surveillance and access control system.
Sanitary installation and water treatment.
Design of rainwater (EP) drainage systems, wastewater, and sewage systems.
Design of potable water supply networks.
3D modeling of the layout of the reverse osmosis water treatment room.
Project Management
The complete project management involved overseeing the execution of the work for the construction of the building, ensuring compliance with the standards and the previously conducted studies.
The main task is to ensure proper monitoring of the initial plans and provide additional technical information to the company responsible for the work.