Project Title

Sector of activity

ERP classification

Location

Project Owner

Architect

Built area /

Land area

Reference

Phase

Start date of the studies

Start date of project management

Collective housing building of type Ground Floor (RDJ) + 3 Upper Floors (R+3)

Housing

—–

Tsinga-village, Yaoundé, centre Cameroon

Private

Menla’ BET

400m2 /

460m2

————–

Complete studies and project management

December 2023

March 2024

The project aims to construct a high-end collective housing building. The structure is of the garden-level, ground floor, and three upper floors type, with a furnished terrace.

Our MISSION

The technical design office Menla’ BET developed the complete architecture and all studies, ranging from geotechnical investigations to detailed plans for architectural, civil engineering, electrical (CFO and CFA), and sanitary installation packages. The design, based on BIM (Building Information Modeling), enabled the various teams to collaborate on a single model throughout the study and to model the entire structure in 3D. The work concluded with a very realistic cost estimate of the project by Menla’ BET’s Quantity Surveying department.

Scope of technical studies

Lot
Consistency
Production
Architecture
- Architectural design (3D Sketch)
- Cladding
- Layout plans, sections, and elevations
- Selection of interior and exterior cladding products
Civil engineering
- Sizing of the reinforced concrete structure
- Sizing of the steel structure for the covered terrace
- 3D model of the frame
- Foundation plans
- Reinforcement and formwork plans
- Calculation notes
Electrical CFO
- Sizing of the electrical distribution network
- Architecture of the lighting system
- Layout plans for electrical outlets
- Layout plans for luminaires and switches
- Electrical diagrams
- Calculation notes
Electrical CFA
- Architecture and selection of video surveillance, access control, and computer network equipment
- Architecture and selection of fire safety equipment
- Layout plan for video surveillance and access control equipment
- Layout plan for fire detection and signaling equipment
- Sanitary Installation
- Sizing of the wastewater drainage network
- Sizing of the potable water supply network
- Functional placement of equipment, plans for the potable water supply network and technical room
- Plans for the drainage and sanitation network

Scope of Project Management

Lot
Consistency
Production
• Architecture
• Civil Engineering
• Electrical CFO (Strong and Weak Currents)
• Electrical CFA (Low Current and Automation Systems)
• Sanitary Installation
- Monitoring the quality and compliance of finishing works
- Technical support during the execution of the works
- As-built plans
- Selection of interior and exterior cladding products
- Detailed plans necessary for the execution of delicate tasks