Project Title

Sector of activity

ERP classification

Location

Project Owner

Architect

Built area /

Land area

Reference

Phase

Start date of project management

Collective housing building of type R+4

Housing

—–

Nkolbong, Yaoundé, centre Cameroun

Private

Menla’ BET

400m2 /

500m2

————–

Project Management

January 2025

The project aims to construct a high-end collective housing building. The structure is of the garden-level, ground floor, and three upper floors type, with a furnished terrace.

Our MISSION

The technical design office Menla’ BET was responsible for the project management of the entire phase of finishing works. The redesign of the plans was based on BIM (Building Information Modeling), enabling the various teams to collaborate on a single model throughout the follow-up process.

Scope of project management work

Lot
Consistency
Production
• Architecture
• Civil engineering
• Electrical CFO (Strong and Weak Currents)
• Electrical CFA (Low Current and Automation Systems)
• Sanitary installation
- Monitoring the quality and compliance of finishing works
- Technical support during the execution of the works
- As-built plans
- Selection of interior and exterior cladding products
- Detailed plans necessary for the execution of delicate tasks