- Home /
- Construction Project: Headquarters Building of Menla’ SARL
Sector of activity
ERP classification
Location
Project Owner
Architect
Built area /
Land area
Reference
Phase
Start date of the studies
Start date of project management
Tertiary
—–
Tsinga-village, Yaoundé, centre Cameroon
MVETO
Menla’ BET
m2 /
m2
————–
Complete studies and project management
December 2022
March 2023
The project aims to construct a high-end office and collective housing building. The structure is of the ground floor and four upper floors type.
Our MISSION
The technical design office Menla’ BET developed the complete architecture and all studies, ranging from geotechnical investigations to detailed plans for architectural, civil engineering, electrical (CFO and CFA), and sanitary installation packages. The design, based on BIM (Building Information Modeling), enabled the various teams to collaborate on a single model throughout the study and to model the entire structure in 3D. The work concluded with a very realistic cost estimate of the project by Menla’ BET’s Quantity Surveying department.
|
Lot
|
Consistency
|
Production
|
|---|---|---|
|
Architecture
|
- Architectural design (3D Sketch)
- Cladding |
- Layout plans, sections, and elevations
- Selection of interior and exterior cladding products |
|
Civil engineering
|
- Sizing of the reinforced concrete structure
- Sizing of the steel structure for the covered terrace |
3D model of the frame
- Foundation plans - Reinforcement and formwork plans - Calculation notes |
|
Electrical CFO
|
- Sizing of the electrical distribution network
- Architecture of the lighting system |
- Layout plans for electrical outlets
- Layout plans for luminaires and switches - Electrical diagrams - Calculation notes |
|
Electrical CFA
|
- Architecture and selection of video surveillance, access control, and computer network equipment
- Architecture and selection of fire safety equipment |
- Layout plan for video surveillance and access control equipment
- Layout plan for fire detection and signaling equipment |
|
Sanitary installation
|
- Sizing of the wastewater drainage network
- Sizing of the potable water supply network |
- Functional placement of equipment, plans for the potable water supply network and technical room
- Plans for the drainage and sanitation network |
|
Lot
|
Consistency
|
Production
|
|---|---|---|
|
• Architecture
• Civil Engineering • Electrical CFO (Strong and Weak Currents) • Electrical CFA (Low Current and Automation Systems) • Sanitary Installation |
- Monitoring the quality and compliance of finishing works
- Technical support during the execution of the works |
- As-built plans
- Selection of interior and exterior cladding products - Detailed plans necessary for the execution of delicate tasks |